Solar power plant · Suffolk, VA
Pleasant Hill Solar
Pleasant Hill Solar is a 20 MW solar power plant in Suffolk city, Virginia, operated by RWE Americas, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 42 GWh, about what 3,300 average Virginia homes use in a year.
Pleasant Hill Solar in context
Among the 144 solar plants in Virginia in the EIA's inventory, it is the 61st largest, about 0.4% of the state's 5.3 GW of solar capacity.
Suffolk city has 4 power plants of 1 MW or more with 54 MW in all; Pleasant Hill Solar is 37% of that and the largest of 4 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Suffolk city goes 8.0 hours a year without power, the 79th most of 123 counties in Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Pleasant Hill Solar (outlined) and other plants in Suffolk city, shaded. 36.692, -76.579.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Suffolk city, VA
- EIA plant ID
- 65220
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PHSPV | Solar Photovoltaic | 20 MW | 2023 | – |
Nearby
Other plants in Suffolk city
Questions
Pleasant Hill Solar, answered
How much power does Pleasant Hill Solar produce?
Pleasant Hill Solar has 20 MW of capacity from one generator. In 2025 it generated 42 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Pleasant Hill Solar power?
Its 2025 output of 42 GWh equals the yearly electricity use of about 3,300 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Pleasant Hill Solar?
Pleasant Hill Solar is in Suffolk city, Virginia, at about 36.692°, -76.579°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Suffolk city goes 8.0 hours a year without power, the 79th most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Pleasant Hill Solar?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Pleasant Hill Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.