Solar power plant · Ada, ID
Pleasant Valley Solar 2 Project
Pleasant Valley Solar 2 Project is a 125 MW solar power plant in Ada County, Idaho, operated by PVS 2, LLC. Its oldest generator still running came online in 2026.
Pleasant Valley Solar 2 Project in context
Among the 14 solar plants in Idaho in the EIA's inventory, it is the 2nd largest, about 15% of the state's 827 MW of solar capacity.
Ada County has 13 power plants of 1 MW or more with 828 MW in all; Pleasant Valley Solar 2 Project is 15% of that and the 2nd largest of 4 solar plants there.
The average electricity customer in Ada County goes 1.1 hours a year without power, the 35th most of 35 counties in Idaho. The county's page has the full outage record.
Where it is
Pleasant Valley Solar 2 Project (outlined) and other plants in Ada County, shaded. 43.328, -115.988.
Plant facts
- Operator
- PVS 2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- IPCO
- County
- Ada County, ID
- EIA plant ID
- 68487
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PVS2 | Solar Photovoltaic | 125 MW | 2026 | – |
Nearby
Other plants in Ada County
Questions
Pleasant Valley Solar 2 Project, answered
How much power does Pleasant Valley Solar 2 Project produce?
Pleasant Valley Solar 2 Project has 125 MW of capacity from one generator. No full year of generation is reported yet.
Where is Pleasant Valley Solar 2 Project?
Pleasant Valley Solar 2 Project is in Ada County, Idaho, at about 43.328°, -115.988°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Ada County goes 1.1 hours a year without power, the 35th most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Pleasant Valley Solar 2 Project?
It is operated by PVS 2, LLC (EIA sector: IPP Non-CHP), and it feeds Idaho Power.
When did Pleasant Valley Solar 2 Project open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.