Wind power plant · Hansford, TX

Porterhouse Wind (4) LLC

Porterhouse Wind (4) LLC is a 80 MW wind power plant in Hansford County, Texas, operated by UPC Power Solutions. Its oldest generator still running came online in 2008. In 2025 it generated 66 GWh, about what 5,000 average Texas homes use in a year.

Capacity80 MWNameplate, September 2026
Generated66 GWhIn 2025
Capacity factor10%Share of the most it could make, 2025
Generators1Oldest from 2008

Porterhouse Wind (4) LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 201st largest, about 0.2% of the state's 45 GW of wind capacity.

Hansford County has 3 power plants of 1 MW or more with 1.2 GW in all; Porterhouse Wind (4) LLC is 7% of that and the 3rd largest of 3 wind plants there.

Its capacity factor of 10% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Hansford County goes 13 hours a year without power, the 97th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020182019202020212022202320242025GWh 66
050100150200250201920212023202566

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Porterhouse Wind (4) LLC (outlined) and other plants in Hansford County, shaded. 36.414, -101.386.

Plant facts

Operator
UPC Power Solutions
Sector
IPP Non-CHP
Grid operator
SWPP
County
Hansford County, TX
EIA plant ID
56560
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
JDW4 Onshore Wind Turbine 80 MW 2008 –

Questions

Porterhouse Wind (4) LLC, answered

How much power does Porterhouse Wind (4) LLC produce?

Porterhouse Wind (4) LLC has 80 MW of capacity from one generator. In 2025 it generated 66 GWh, 10% of the most it could have made running flat out all year (its capacity factor).

How many homes does Porterhouse Wind (4) LLC power?

Its 2025 output of 66 GWh equals the yearly electricity use of about 5,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Porterhouse Wind (4) LLC?

Porterhouse Wind (4) LLC is in Hansford County, Texas, at about 36.414°, -101.386°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Hansford County goes 13 hours a year without power, the 97th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Porterhouse Wind (4) LLC?

It is operated by UPC Power Solutions (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did Porterhouse Wind (4) LLC open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.