Solar power plant · Potter, PA

Potter Solar

Potter Solar is a 35 MW solar power plant in Potter County, Pennsylvania, operated by Potter Solar, LLC. Its oldest generator still running came online in 2026.

Capacity35 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Potter Solar in context

Among the 82 solar plants in Pennsylvania in the EIA's inventory, it is the 7th largest, about 2.8% of the state's 1.2 GW of solar capacity.

Potter County has 2 power plants of 1 MW or more with 125 MW in all; Potter Solar is 28% of that.

The average electricity customer in Potter County goes 8.4 hours a year without power, the 23rd most of 67 counties in Pennsylvania. The county's page has the full outage record.

Where it is

Potter Solar (outlined) and other plants in Potter County, shaded. 41.838, -78.048.

Plant facts

Operator
Potter Solar, LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Potter County, PA
EIA plant ID
67876
Where Pennsylvania's power comes from → Pennsylvania power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ENX35 Solar Photovoltaic 35 MW 2026 –

Nearby

Other plants in Potter County

Questions

Potter Solar, answered

How much power does Potter Solar produce?

Potter Solar has 35 MW of capacity from one generator. No full year of generation is reported yet.

Where is Potter Solar?

Potter Solar is in Potter County, Pennsylvania, at about 41.838°, -78.048°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Potter County goes 8.4 hours a year without power, the 23rd most of 67 counties in Pennsylvania. The county's page has the full outage record.

Who operates Potter Solar?

It is operated by Potter Solar, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Potter Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.