Natural gas power plant · McCracken, KY

PPS Power Plant No 1

PPS Power Plant No 1 is a 120 MW natural gas power plant in McCracken County, Kentucky, operated by Paducah Power System. Its oldest generator still running came online in 2010. In 2025 it generated 154 GWh, about what 12,000 average Kentucky homes use in a year.

Capacity120 MWNameplate, September 2026
Generated154 GWhIn 2025
Capacity factor15%Share of the most it could make, 2025
Generators2Oldest from 2010

PPS Power Plant No 1 in context

Among the 14 natural gas plants in Kentucky in the EIA's inventory, it is the 11th largest, about 1.4% of the state's 8.8 GW of natural gas capacity.

McCracken County has 2 power plants of 1 MW or more with 1.7 GW in all; PPS Power Plant No 1 is 7% of that.

Its capacity factor of 15% in 2025 is lower than the 23% typical for natural gas plants across the US.

The average electricity customer in McCracken County goes 2.5 hours a year without power, the 115th most of 119 counties in Kentucky. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 154
0501001502002019202120232025154

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

PPS Power Plant No 1 (outlined) and other plants in McCracken County, shaded. 37.034, -88.616.

Plant facts

Operator
Paducah Power System
Sector
Electric Utility
Grid operator
LGEE
County
McCracken County, KY
EIA plant ID
56556
Where Kentucky's power comes from → Kentucky power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Natural Gas Fired Combustion Turbine 60 MW 2010 –
2 Natural Gas Fired Combustion Turbine 60 MW 2010 –

Nearby

Other plants in McCracken County

Questions

PPS Power Plant No 1, answered

How much power does PPS Power Plant No 1 produce?

PPS Power Plant No 1 has 120 MW of capacity from 2 generators. In 2025 it generated 154 GWh, 15% of the most it could have made running flat out all year (its capacity factor).

How many homes does PPS Power Plant No 1 power?

Its 2025 output of 154 GWh equals the yearly electricity use of about 12,000 average Kentucky homes (1,094 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is PPS Power Plant No 1?

PPS Power Plant No 1 is in McCracken County, Kentucky, at about 37.034°, -88.616°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in McCracken County goes 2.5 hours a year without power, the 115th most of 119 counties in Kentucky. The county's page has the full outage record.

Who operates PPS Power Plant No 1?

It is operated by Paducah Power System (EIA sector: Electric Utility), and it feeds balancing authority LGEE.

When did PPS Power Plant No 1 open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Kentucky home's 1,094 kWh a month in 2025. Methodology.