Solar power plant · Perry, IL

Prairie State Solar Project

Prairie State Solar Project is a 99 MW solar power plant in Perry County, Illinois, operated by Prairie State Solar, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 220 GWh, about what 26,000 average Illinois homes use in a year.

Capacity99 MWNameplate, September 2026
Generated220 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2021

Prairie State Solar Project in context

Among the 476 solar plants in Illinois in the EIA's inventory, it is the 20th largest, about 1.7% of the state's 5.9 GW of solar capacity.

Perry County has 5 power plants of 1 MW or more with 535 MW in all; Prairie State Solar Project is 19% of that and the largest of 4 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Perry County goes 5.6 hours a year without power, the 35th most of 101 counties in Illinois. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030020212022202320242025GWh 220
010020030020212022202320242025220

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Prairie State Solar Project (outlined) and other plants in Perry County, shaded. 38.208, -89.579.

Plant facts

Operator
Prairie State Solar, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Perry County, IL
EIA plant ID
62420
Where Illinois's power comes from → Illinois power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PSS01 Solar Photovoltaic 99 MW 2021 –

Nearby

Other plants in Perry County

Pinckneyville · 380 MWKimmel Road Solar, LLC · 50 MWCVE US IL TAMAROA 316 LLC · 3.6 MWNL IL - Kiwi · 2.0 MW

Questions

Prairie State Solar Project, answered

How much power does Prairie State Solar Project produce?

Prairie State Solar Project has 99 MW of capacity from one generator. In 2025 it generated 220 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Prairie State Solar Project power?

Its 2025 output of 220 GWh equals the yearly electricity use of about 26,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Prairie State Solar Project?

Prairie State Solar Project is in Perry County, Illinois, at about 38.208°, -89.579°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Perry County goes 5.6 hours a year without power, the 35th most of 101 counties in Illinois. The county's page has the full outage record.

Who operates Prairie State Solar Project?

It is operated by Prairie State Solar, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Prairie State Solar Project open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.