Solar power plant · Pulaski, IL

Pulaski Solar

Pulaski Solar is a 417 MW solar power plant in Pulaski County, Illinois, operated by Joppa BESS LLC. Its oldest generator still running came online in 2026.

Capacity417 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Pulaski Solar in context

Among the 476 solar plants in Illinois in the EIA's inventory, it is the 2nd largest, about 7.1% of the state's 5.9 GW of solar capacity.

Pulaski County has 2 power plants of 1 MW or more with 422 MW in all; Pulaski Solar is 99% of that and the largest of 2 solar plants there.

The average electricity customer in Pulaski County goes 3.1 hours a year without power, the 71st most of 101 counties in Illinois. The county's page has the full outage record.

Where it is

Pulaski Solar (outlined) and other plants in Pulaski County, shaded. 37.265, -88.952.

Plant facts

Operator
Joppa BESS LLC
Sector
IPP Non-CHP
Grid operator
GLHB
County
Pulaski County, IL
EIA plant ID
69025
Where Illinois's power comes from → Illinois power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PLSKI Solar Photovoltaic 417 MW 2026 –

Nearby

Other plants in Pulaski County

Mound City Solar · 5.0 MW

Questions

Pulaski Solar, answered

How much power does Pulaski Solar produce?

Pulaski Solar has 417 MW of capacity from one generator. No full year of generation is reported yet.

Where is Pulaski Solar?

Pulaski Solar is in Pulaski County, Illinois, at about 37.265°, -88.952°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Pulaski County goes 3.1 hours a year without power, the 71st most of 101 counties in Illinois. The county's page has the full outage record.

Who operates Pulaski Solar?

It is operated by Joppa BESS LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority GLHB.

When did Pulaski Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.