Solar power plant · Middlesex, VA
Puller Solar
Puller Solar is a 15 MW solar power plant in Middlesex County, Virginia, operated by Dominion Energy Inc.. Its oldest generator still running came online in 2018. In 2025 it generated 27 GWh, about what 2,100 average Virginia homes use in a year.
Puller Solar in context
Among the 144 solar plants in Virginia in the EIA's inventory, it is the 86th largest, about 0.3% of the state's 5.3 GW of solar capacity.
Middlesex County has 2 power plants of 1 MW or more with 21 MW in all; Puller Solar is 70% of that.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Middlesex County goes 27 hours a year without power, the 23rd most of 123 counties in Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Puller Solar (outlined) and other plants in Middlesex County, shaded. 37.572, -76.467.
Plant facts
- Operator
- Dominion Energy Inc.
- Sector
- Electric Utility
- Grid operator
- PJM
- County
- Middlesex County, VA
- EIA plant ID
- 62140
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PULL | Solar Photovoltaic | 15 MW | 2018 | – |
Nearby
Other plants in Middlesex County
Questions
Puller Solar, answered
How much power does Puller Solar produce?
Puller Solar has 15 MW of capacity from one generator. In 2025 it generated 27 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Puller Solar power?
Its 2025 output of 27 GWh equals the yearly electricity use of about 2,100 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Puller Solar?
Puller Solar is in Middlesex County, Virginia, at about 37.572°, -76.467°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Middlesex County goes 27 hours a year without power, the 23rd most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Puller Solar?
It is operated by Dominion Energy Inc. (EIA sector: Electric Utility), and it feeds PJM Interconnection.
When did Puller Solar open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.