Hydro power plant · Polk, TX

RC Thomas Hydroelectric Project

RC Thomas Hydroelectric Project is a 27 MW hydro power plant in Polk County, Texas, operated by East Texas Electric Coop, Inc. Its oldest generator still running came online in 2020. In 2025 it generated 124 GWh, about what 9,300 average Texas homes use in a year.

Capacity27 MWNameplate, September 2026
Generated124 GWhIn 2025
Capacity factor53%Share of the most it could make, 2025
Generators3Oldest from 2020

RC Thomas Hydroelectric Project in context

Among the 23 hydro plants in Texas in the EIA's inventory, it is the 11th largest, about 3.6% of the state's 735 MW of hydro capacity.

Polk County has 2 power plants of 1 MW or more with 177 MW in all; RC Thomas Hydroelectric Project is 15% of that.

Its capacity factor of 53% in 2025 is higher than the 34% typical for hydro plants across the US.

The average electricity customer in Polk County goes 17 hours a year without power, the 52nd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150202020212022202320242025GWh 124
050100150202020212022202320242025124

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

RC Thomas Hydroelectric Project (outlined) and other plants in Polk County, shaded. 30.632, -95.010.

Plant facts

Operator
East Texas Electric Coop, Inc
Sector
Electric Utility
Grid operator
MISO
County
Polk County, TX
EIA plant ID
58645
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RCT1 Conventional Hydroelectric 8.9 MW 2020 –
RCT2 Conventional Hydroelectric 8.9 MW 2020 –
RCT3 Conventional Hydroelectric 8.9 MW 2020 –

Nearby

Other plants in Polk County

Questions

RC Thomas Hydroelectric Project, answered

How much power does RC Thomas Hydroelectric Project produce?

RC Thomas Hydroelectric Project has 27 MW of capacity from 3 generators. In 2025 it generated 124 GWh, 53% of the most it could have made running flat out all year (its capacity factor).

How many homes does RC Thomas Hydroelectric Project power?

Its 2025 output of 124 GWh equals the yearly electricity use of about 9,300 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is RC Thomas Hydroelectric Project?

RC Thomas Hydroelectric Project is in Polk County, Texas, at about 30.632°, -95.010°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Polk County goes 17 hours a year without power, the 52nd most of 240 counties in Texas. The county's page has the full outage record.

Who operates RC Thomas Hydroelectric Project?

It is operated by East Texas Electric Coop, Inc (EIA sector: Electric Utility), and it feeds MISO.

When did RC Thomas Hydroelectric Project open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.