Solar power plant · Dorchester, MD
Richfield Solar Energy LLC
Richfield Solar Energy LLC is a 50 MW solar power plant in Dorchester County, Maryland, operated by Invenergy Services LLC. Its oldest generator still running came online in 2024.
Richfield Solar Energy LLC in context
Among the 214 solar plants in Maryland in the EIA's inventory, it is the 7th largest, about 3.5% of the state's 1.4 GW of solar capacity.
Dorchester County has 8 power plants of 1 MW or more with 310 MW in all; Richfield Solar Energy LLC is 16% of that and the 2nd largest of 7 solar plants there.
The average electricity customer in Dorchester County goes 2.2 hours a year without power, the 20th most of 24 counties in Maryland. The county's page has the full outage record.
Where it is
Richfield Solar Energy LLC (outlined) and other plants in Dorchester County, shaded. 38.604, -75.866.
Plant facts
- Operator
- Invenergy Services LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Dorchester County, MD
- EIA plant ID
- 70426
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RCHFD | Solar Photovoltaic | 50 MW | 2024 | – |
Nearby
Other plants in Dorchester County
Questions
Richfield Solar Energy LLC, answered
How much power does Richfield Solar Energy LLC produce?
Richfield Solar Energy LLC has 50 MW of capacity from one generator. No full year of generation is reported yet.
Where is Richfield Solar Energy LLC?
Richfield Solar Energy LLC is in Dorchester County, Maryland, at about 38.604°, -75.866°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Dorchester County goes 2.2 hours a year without power, the 20th most of 24 counties in Maryland. The county's page has the full outage record.
Who operates Richfield Solar Energy LLC?
It is operated by Invenergy Services LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Richfield Solar Energy LLC open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.