Solar power plant · Marshall, IL

Richland Township Solar II, LLC

Richland Township Solar II, LLC is a 11 MW solar power plant in Marshall County, Illinois, operated by Birch Creek Power, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 5.5 GWh, about what 640 average Illinois homes use in a year.

Capacity11 MWNameplate, September 2026
Generated5.5 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Richland Township Solar II, LLC in context

Among the 476 solar plants in Illinois in the EIA's inventory, it is the 35th largest, about 0.2% of the state's 5.9 GW of solar capacity.

Marshall County has 7 power plants of 1 MW or more with 146 MW in all; Richland Township Solar II, LLC is 7% of that and the 2nd largest of 6 solar plants there.

The average electricity customer in Marshall County goes 8.8 hours a year without power, the 11th most of 101 counties in Illinois. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Richland Township Solar II, LLC (outlined) and other plants in Marshall County, shaded. 40.944, -89.270.

Plant facts

Operator
Birch Creek Power, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Marshall County, IL
EIA plant ID
68928
Where Illinois's power comes from → Illinois power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RICH2 Solar Photovoltaic 11 MW 2025 –

Nearby

Other plants in Marshall County

Bennington Wind · 93 MWRichland Township Solar, LLC · 35 MWSchulte 2 Community Solar · 2.0 MWSparland Solar, LLC · 2.0 MWIllinois River Solar 2, LLC · 2.0 MWHopewell Solar, LLC · 1.6 MW

Questions

Richland Township Solar II, LLC, answered

How much power does Richland Township Solar II, LLC produce?

Richland Township Solar II, LLC has 11 MW of capacity from one generator. In 2025 it generated 5.5 GWh.

How many homes does Richland Township Solar II, LLC power?

Its 2025 output of 5.5 GWh equals the yearly electricity use of about 640 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Richland Township Solar II, LLC?

Richland Township Solar II, LLC is in Marshall County, Illinois, at about 40.944°, -89.270°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Marshall County goes 8.8 hours a year without power, the 11th most of 101 counties in Illinois. The county's page has the full outage record.

Who operates Richland Township Solar II, LLC?

It is operated by Birch Creek Power, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Richland Township Solar II, LLC open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.