Solar power plant · Clark, IL
River Ferry Solar 1
River Ferry Solar 1 is a 165 MW solar power plant in Clark County, Illinois, operated by River Ferry Solar 1, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 304 GWh, about what 35,000 average Illinois homes use in a year.
River Ferry Solar 1 in context
Among the 476 solar plants in Illinois in the EIA's inventory, it is the 7th largest, about 2.8% of the state's 5.9 GW of solar capacity.
Clark County has 4 power plants of 1 MW or more with 189 MW in all; River Ferry Solar 1 is 88% of that and the largest of 2 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Clark County goes 6.3 hours a year without power, the 23rd most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
River Ferry Solar 1 (outlined) and other plants in Clark County, shaded. 39.259, -87.628.
Plant facts
- Operator
- River Ferry Solar 1, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Clark County, IL
- EIA plant ID
- 66820
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RVFRY | Solar Photovoltaic | 165 MW | 2023 | – |
Nearby
Other plants in Clark County
Questions
River Ferry Solar 1, answered
How much power does River Ferry Solar 1 produce?
River Ferry Solar 1 has 165 MW of capacity from one generator. In 2025 it generated 304 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does River Ferry Solar 1 power?
Its 2025 output of 304 GWh equals the yearly electricity use of about 35,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is River Ferry Solar 1?
River Ferry Solar 1 is in Clark County, Illinois, at about 39.259°, -87.628°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Clark County goes 6.3 hours a year without power, the 23rd most of 101 counties in Illinois. The county's page has the full outage record.
Who operates River Ferry Solar 1?
It is operated by River Ferry Solar 1, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did River Ferry Solar 1 open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.