Wind power plant · Cass, IA

Rolling Hills Wind Farm

Rolling Hills Wind Farm is a 484 MW wind power plant in Cass County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2011. In 2025 it generated 1.6 TWh, about what 153,000 average Iowa homes use in a year.

Capacity484 MWNameplate, September 2026
Generated1.6 TWhIn 2025
Capacity factor37%Share of the most it could make, 2025
Generators1Oldest from 2011

Rolling Hills Wind Farm in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 3rd largest, about 3.6% of the state's 13 GW of wind capacity.

Cass County has 6 power plants of 1 MW or more with 502 MW in all; Rolling Hills Wind Farm is 96% of that and the largest of 4 wind plants there.

Its capacity factor of 37% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Cass County goes 1.3 hours a year without power, the 95th most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,5002,00020182019202020212022202320242025GWh 1,578
05001,0001,5002,00020192021202320251,578

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Rolling Hills Wind Farm (outlined) and other plants in Cass County, shaded. 41.197, -94.774.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Cass County, IA
EIA plant ID
57501
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RHWF Onshore Wind Turbine 484 MW 2011 –

Nearby

Other plants in Cass County

Atlantic · 10 MWAnita · 2.9 MWRoseman · 1.8 MWGreen Energy Machine · 1.7 MWWiota · 1.6 MW

Questions

Rolling Hills Wind Farm, answered

How much power does Rolling Hills Wind Farm produce?

Rolling Hills Wind Farm has 484 MW of capacity from one generator. In 2025 it generated 1.6 TWh, 37% of the most it could have made running flat out all year (its capacity factor).

How many homes does Rolling Hills Wind Farm power?

Its 2025 output of 1.6 TWh equals the yearly electricity use of about 153,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Rolling Hills Wind Farm?

Rolling Hills Wind Farm is in Cass County, Iowa, at about 41.197°, -94.774°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Cass County goes 1.3 hours a year without power, the 95th most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Rolling Hills Wind Farm?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Rolling Hills Wind Farm open?

Its oldest generator still running came online in 2011.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.