Solar power plant · Greensville, VA

Sadler Solar

Sadler Solar is a 100 MW solar power plant in Greensville County, Virginia, operated by Dominion Energy Inc.. Its oldest generator still running came online in 2021. In 2025 it generated 184 GWh, about what 14,000 average Virginia homes use in a year.

Capacity100 MWNameplate, September 2026
Generated184 GWhIn 2025
Capacity factor21%Share of the most it could make, 2025
Generators1Oldest from 2021

Sadler Solar in context

Among the 144 solar plants in Virginia in the EIA's inventory, it is the 16th largest, about 1.9% of the state's 5.3 GW of solar capacity.

Greensville County has 6 power plants of 1 MW or more with 2.1 GW in all; Sadler Solar is 5% of that and the largest of 4 solar plants there.

Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Greensville County goes 5.6 hours a year without power, the 101st most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020212022202320242025GWh 184
05010015020025020212022202320242025184

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sadler Solar (outlined) and other plants in Greensville County, shaded. 36.687, -77.558.

Plant facts

Operator
Dominion Energy Inc.
Sector
Electric Utility
Grid operator
PJM
County
Greensville County, VA
EIA plant ID
62814
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SADL Solar Photovoltaic 100 MW 2021 –

Questions

Sadler Solar, answered

How much power does Sadler Solar produce?

Sadler Solar has 100 MW of capacity from one generator. In 2025 it generated 184 GWh, 21% of the most it could have made running flat out all year (its capacity factor).

How many homes does Sadler Solar power?

Its 2025 output of 184 GWh equals the yearly electricity use of about 14,000 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sadler Solar?

Sadler Solar is in Greensville County, Virginia, at about 36.687°, -77.558°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Greensville County goes 5.6 hours a year without power, the 101st most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Sadler Solar?

It is operated by Dominion Energy Inc. (EIA sector: Electric Utility), and it feeds PJM Interconnection.

When did Sadler Solar open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.