Wind power plant · Donley, TX

Salt Fork Wind Project, LLC

Salt Fork Wind Project, LLC is a 174 MW wind power plant in Donley County, Texas, operated by Southern Power Co. Its oldest generator still running came online in 2016. In 2025 it generated 680 GWh, about what 51,000 average Texas homes use in a year.

Capacity174 MWNameplate, September 2026
Generated680 GWhIn 2025
Capacity factor45%Share of the most it could make, 2025
Generators1Oldest from 2016

Salt Fork Wind Project, LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 126th largest, about 0.4% of the state's 45 GW of wind capacity.

Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Donley County goes 14 hours a year without power, the 86th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,00020182019202020212022202320242025GWh 680
02004006008001,0002019202120232025680

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Salt Fork Wind Project, LLC (outlined) and other plants in Donley County, shaded. 35.182, -100.934.

Plant facts

Operator
Southern Power Co
Sector
IPP Non-CHP
Grid operator
ERCO
County
Donley County, TX
EIA plant ID
60657
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Onshore Wind Turbine 174 MW 2016 –

Questions

Salt Fork Wind Project, LLC, answered

How much power does Salt Fork Wind Project, LLC produce?

Salt Fork Wind Project, LLC has 174 MW of capacity from one generator. In 2025 it generated 680 GWh, 45% of the most it could have made running flat out all year (its capacity factor).

How many homes does Salt Fork Wind Project, LLC power?

Its 2025 output of 680 GWh equals the yearly electricity use of about 51,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Salt Fork Wind Project, LLC?

Salt Fork Wind Project, LLC is in Donley County, Texas, at about 35.182°, -100.934°. The average electricity customer in Donley County goes 14 hours a year without power, the 86th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Salt Fork Wind Project, LLC?

It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Salt Fork Wind Project, LLC open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.