Wind power plant · Donley, TX
Salt Fork Wind Project, LLC
Salt Fork Wind Project, LLC is a 174 MW wind power plant in Donley County, Texas, operated by Southern Power Co. Its oldest generator still running came online in 2016. In 2025 it generated 680 GWh, about what 51,000 average Texas homes use in a year.
Salt Fork Wind Project, LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 126th largest, about 0.4% of the state's 45 GW of wind capacity.
Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Donley County goes 14 hours a year without power, the 86th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Salt Fork Wind Project, LLC (outlined) and other plants in Donley County, shaded. 35.182, -100.934.
Plant facts
- Operator
- Southern Power Co
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Donley County, TX
- EIA plant ID
- 60657
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 174 MW | 2016 | – |
Questions
Salt Fork Wind Project, LLC, answered
How much power does Salt Fork Wind Project, LLC produce?
Salt Fork Wind Project, LLC has 174 MW of capacity from one generator. In 2025 it generated 680 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Salt Fork Wind Project, LLC power?
Its 2025 output of 680 GWh equals the yearly electricity use of about 51,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Salt Fork Wind Project, LLC?
Salt Fork Wind Project, LLC is in Donley County, Texas, at about 35.182°, -100.934°. The average electricity customer in Donley County goes 14 hours a year without power, the 86th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Salt Fork Wind Project, LLC?
It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Salt Fork Wind Project, LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.