Solar power plant · Franklin, TX

Samson Solar Energy

Samson Solar Energy is a 250 MW solar power plant in Franklin County, Texas, operated by Invenergy Services LLC. Its oldest generator still running came online in 2022. In 2025 it generated 347 GWh, about what 26,000 average Texas homes use in a year.

Capacity250 MWNameplate, September 2026
Generated347 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators1Oldest from 2022

Samson Solar Energy in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 45th largest, about 0.7% of the state's 37 GW of solar capacity.

Franklin County has 2 power plants of 1 MW or more with 258 MW in all; Samson Solar Energy is 97% of that and the largest of 2 solar plants there.

Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Franklin County goes 33 hours a year without power, the 14th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01002003004005002022202320242025GWh 347
01002003004005002022202320242025347

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Samson Solar Energy (outlined) and other plants in Franklin County, shaded. 33.251, -95.193.

Plant facts

Operator
Invenergy Services LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Franklin County, TX
EIA plant ID
63211
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Solar Photovoltaic 250 MW 2022 –

Nearby

Other plants in Franklin County

Talco Solar Project · 7.5 MW

Questions

Samson Solar Energy, answered

How much power does Samson Solar Energy produce?

Samson Solar Energy has 250 MW of capacity from one generator. In 2025 it generated 347 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does Samson Solar Energy power?

Its 2025 output of 347 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Samson Solar Energy?

Samson Solar Energy is in Franklin County, Texas, at about 33.251°, -95.193°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Franklin County goes 33 hours a year without power, the 14th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Samson Solar Energy?

It is operated by Invenergy Services LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Samson Solar Energy open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.