Wind power plant · Reagan, TX
Santa Rita Wind Energy
Santa Rita Wind Energy is a 300 MW wind power plant in Reagan County, Texas, operated by BHE Renewables, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 1.2 TWh, about what 87,000 average Texas homes use in a year.
Santa Rita Wind Energy in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 29th largest, about 0.7% of the state's 45 GW of wind capacity.
Reagan County has 2 power plants of 1 MW or more with 310 MW in all; Santa Rita Wind Energy is 97% of that.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Reagan County goes 22 hours a year without power, the 36th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Santa Rita Wind Energy (outlined) and other plants in Reagan County, shaded. 31.181, -101.319.
Plant facts
- Operator
- BHE Renewables, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Reagan County, TX
- EIA plant ID
- 60987
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 300 MW | 2018 | – |
Nearby
Other plants in Reagan County
Questions
Santa Rita Wind Energy, answered
How much power does Santa Rita Wind Energy produce?
Santa Rita Wind Energy has 300 MW of capacity from one generator. In 2025 it generated 1.2 TWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Santa Rita Wind Energy power?
Its 2025 output of 1.2 TWh equals the yearly electricity use of about 87,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Santa Rita Wind Energy?
Santa Rita Wind Energy is in Reagan County, Texas, at about 31.181°, -101.319°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Reagan County goes 22 hours a year without power, the 36th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Santa Rita Wind Energy?
It is operated by BHE Renewables, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Santa Rita Wind Energy open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.