Solar power plant · Branch, MI

Sauk Solar Park

Sauk Solar Park is a 150 MW solar power plant in Branch County, Michigan, operated by DTE Electric Company. Its oldest generator still running came online in 2025. In 2025 it generated 209 GWh, about what 27,000 average Michigan homes use in a year.

Capacity150 MWNameplate, September 2026
Generated209 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Sauk Solar Park in context

Among the 79 solar plants in Michigan in the EIA's inventory, it is the 6th largest, about 4.5% of the state's 3.3 GW of solar capacity.

Branch County has 9 power plants of 1 MW or more with 741 MW in all; Sauk Solar Park is 20% of that and the 2nd largest of 7 solar plants there.

The average electricity customer in Branch County goes 15 hours a year without power, the 38th most of 83 counties in Michigan. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sauk Solar Park (outlined) and other plants in Branch County, shaded. 42.062, -85.103.

Plant facts

Operator
DTE Electric Company
Sector
Electric Utility
Grid operator
MISO
County
Branch County, MI
EIA plant ID
67942
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SAUSP Solar Photovoltaic 150 MW 2025 –

Questions

Sauk Solar Park, answered

How much power does Sauk Solar Park produce?

Sauk Solar Park has 150 MW of capacity from one generator. In 2025 it generated 209 GWh.

How many homes does Sauk Solar Park power?

Its 2025 output of 209 GWh equals the yearly electricity use of about 27,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sauk Solar Park?

Sauk Solar Park is in Branch County, Michigan, at about 42.062°, -85.103°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Branch County goes 15 hours a year without power, the 38th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Sauk Solar Park?

It is operated by DTE Electric Company (EIA sector: Electric Utility), and it feeds MISO.

When did Sauk Solar Park open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.