Storage power plant · Austin, TX

Sealy BESS

Sealy BESS is a 200 MW storage power plant in Austin County, Texas, operated by Sealy Power, LLC. Its oldest generator still running came online in 2025.

Capacity200 MWNameplate, September 2026
Net energy-2.9 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Sealy BESS in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 30th largest, about 1.2% of the state's 16 GW of storage capacity.

Austin County has 2 power plants of 1 MW or more with 210 MW in all; Sealy BESS is 95% of that.

The average electricity customer in Austin County goes 78 hours a year without power, the 1st most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Sealy BESS (outlined) and other plants in Austin County, shaded. 29.848, -96.199.

Plant facts

Operator
Sealy Power, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Austin County, TX
EIA plant ID
69045
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WAL Batteries 200 MW · 400 MWh 2025 –

Nearby

Other plants in Austin County

Questions

Sealy BESS, answered

How much can Sealy BESS store and deliver?

Sealy BESS can deliver up to 200 MW and hold 400 MWh of energy, from one battery or storage system. Its net energy in 2025 was -2.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Sealy BESS?

Sealy BESS is in Austin County, Texas, at about 29.848°, -96.199°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Austin County goes 78 hours a year without power, the 1st most of 240 counties in Texas. The county's page has the full outage record.

Who operates Sealy BESS?

It is operated by Sealy Power, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Sealy BESS open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.