Solar power plant · Prince George, VA

Sebera Solar

Sebera Solar is a 18 MW solar power plant in Prince George County, Virginia, operated by Dominion Renewable Energy. Its oldest generator still running came online in 2025. In 2025 it generated 23 GWh, about what 1,800 average Virginia homes use in a year.

Capacity18 MWNameplate, September 2026
Generated23 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Sebera Solar in context

Among the 144 solar plants in Virginia in the EIA's inventory, it is the 79th largest, about 0.3% of the state's 5.3 GW of solar capacity.

Prince George County has 4 power plants of 1 MW or more with 587 MW in all; Sebera Solar is 3% of that and the 3rd largest of 3 solar plants there.

The average electricity customer in Prince George County goes 5.2 hours a year without power, the 103rd most of 123 counties in Virginia. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sebera Solar (outlined) and other plants in Prince George County, shaded. 37.250, -77.250.

Plant facts

Operator
Dominion Renewable Energy
Sector
Electric Utility
Grid operator
PJM
County
Prince George County, VA
EIA plant ID
65320
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SEBE Solar Photovoltaic 18 MW 2025 –

Questions

Sebera Solar, answered

How much power does Sebera Solar produce?

Sebera Solar has 18 MW of capacity from one generator. In 2025 it generated 23 GWh.

How many homes does Sebera Solar power?

Its 2025 output of 23 GWh equals the yearly electricity use of about 1,800 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sebera Solar?

Sebera Solar is in Prince George County, Virginia, at about 37.250°, -77.250°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Prince George County goes 5.2 hours a year without power, the 103rd most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Sebera Solar?

It is operated by Dominion Renewable Energy (EIA sector: Electric Utility), and it feeds PJM Interconnection.

When did Sebera Solar open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.