Solar power plant · Sherburne, MN
Sherco Solar III
Sherco Solar III is a 250 MW solar power plant in Sherburne County, Minnesota, operated by Northern States Power Co - Minnesota. Its oldest generator still running came online in 2026.
Sherco Solar III in context
Among the 544 solar plants in Minnesota in the EIA's inventory, it is the largest, about 12% of the state's 2.1 GW of solar capacity.
Sherburne County has 33 power plants of 1 MW or more with 2.7 GW in all; Sherco Solar III is 9% of that and the largest of 31 solar plants there.
The average electricity customer in Sherburne County goes 1.4 hours a year without power, the 47th most of 54 counties in Minnesota. The county's page has the full outage record.
Where it is
Sherco Solar III (outlined) and other plants in Sherburne County, shaded. 45.433, -94.008.
Plant facts
- Operator
- Northern States Power Co - Minnesota
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Sherburne County, MN
- EIA plant ID
- 68777
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SHS03 | Solar Photovoltaic | 250 MW | 2026 | – |
Nearby
Other plants in Sherburne County
Questions
Sherco Solar III, answered
How much power does Sherco Solar III produce?
Sherco Solar III has 250 MW of capacity from one generator. No full year of generation is reported yet.
Where is Sherco Solar III?
Sherco Solar III is in Sherburne County, Minnesota, at about 45.433°, -94.008°. It is one of 33 power plants of 1 MW or more in the county. The average electricity customer in Sherburne County goes 1.4 hours a year without power, the 47th most of 54 counties in Minnesota. The county's page has the full outage record.
Who operates Sherco Solar III?
It is operated by Northern States Power Co - Minnesota (EIA sector: Electric Utility), and it feeds MISO.
When did Sherco Solar III open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.