Coal power plant · Lake, MN
Silver Bay Power
Silver Bay Power is a 132 MW coal power plant in Lake County, Minnesota, operated by Cleveland Cliffs Inc. Its oldest generator still running came online in 1955.
Silver Bay Power in context
Among the 8 coal plants in Minnesota in the EIA's inventory, it is the 4th largest, about 3.9% of the state's 3.4 GW of coal capacity.
Lake County has 2 power plants of 1 MW or more with 136 MW in all; Silver Bay Power is 97% of that.
The average electricity customer in Lake County goes 7.3 hours a year without power, the 5th most of 54 counties in Minnesota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
Silver Bay Power (outlined) and other plants in Lake County, shaded. 47.287, -91.261.
Plant facts
- Operator
- Cleveland Cliffs Inc
- Sector
- Industrial CHP
- Grid operator
- MISO
- County
- Lake County, MN
- EIA plant ID
- 10849
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN2 | Conventional Steam Coal | 82 MW | 1962 | – |
| GEN1 | Conventional Steam Coal | 50 MW | 1955 | – |
Nearby
Other plants in Lake County
Questions
Silver Bay Power, answered
How much power does Silver Bay Power produce?
Silver Bay Power has 132 MW of capacity from 2 generators. No full year of generation is reported yet.
Where is Silver Bay Power?
Silver Bay Power is in Lake County, Minnesota, at about 47.287°, -91.261°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Lake County goes 7.3 hours a year without power, the 5th most of 54 counties in Minnesota. The county's page has the full outage record.
Who operates Silver Bay Power?
It is operated by Cleveland Cliffs Inc (EIA sector: Industrial CHP), and it feeds MISO.
When did Silver Bay Power open?
Its oldest generator still running came online in 1955.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.