Silver Star I Wind Power Project
Silver Star I Wind Power Project is a 53 MW wind power plant in Erath County, Texas, operated by Silver Star I Power Partners LLC. Its oldest generator still running came online in 2008. In 2025 it generated 205 GWh, about what 15,000 average Texas homes use in a year.
Silver Star I Wind Power Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 211th largest, about 0.1% of the state's 45 GW of wind capacity.
Erath County has 3 power plants of 1 MW or more with 163 MW in all; Silver Star I Wind Power Project is 32% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Erath County goes 7.2 hours a year without power, the 157th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Silver Star I Wind Power Project (outlined) and other plants in Erath County, shaded. 32.339, -98.476.
Plant facts
- Operator
- Silver Star I Power Partners LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Erath County, TX
- EIA plant ID
- 56771
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 53 MW | 2008 | – |
Nearby
Other plants in Erath County
Questions
Silver Star I Wind Power Project, answered
How much power does Silver Star I Wind Power Project produce?
Silver Star I Wind Power Project has 53 MW of capacity from one generator. In 2025 it generated 205 GWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Silver Star I Wind Power Project power?
Its 2025 output of 205 GWh equals the yearly electricity use of about 15,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Silver Star I Wind Power Project?
Silver Star I Wind Power Project is in Erath County, Texas, at about 32.339°, -98.476°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Erath County goes 7.2 hours a year without power, the 157th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Silver Star I Wind Power Project?
It is operated by Silver Star I Power Partners LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Silver Star I Wind Power Project open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.