Wind power plant · Erath, TX

Silver Star I Wind Power Project

Silver Star I Wind Power Project is a 53 MW wind power plant in Erath County, Texas, operated by Silver Star I Power Partners LLC. Its oldest generator still running came online in 2008. In 2025 it generated 205 GWh, about what 15,000 average Texas homes use in a year.

Capacity53 MWNameplate, September 2026
Generated205 GWhIn 2025
Capacity factor44%Share of the most it could make, 2025
Generators1Oldest from 2008

Silver Star I Wind Power Project in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 211th largest, about 0.1% of the state's 45 GW of wind capacity.

Erath County has 3 power plants of 1 MW or more with 163 MW in all; Silver Star I Wind Power Project is 32% of that and the 2nd largest of 2 wind plants there.

Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Erath County goes 7.2 hours a year without power, the 157th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020025020182019202020212022202320242025GWh 205
0501001502002502019202120232025205

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Silver Star I Wind Power Project (outlined) and other plants in Erath County, shaded. 32.339, -98.476.

Plant facts

Operator
Silver Star I Power Partners LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Erath County, TX
EIA plant ID
56771
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 53 MW 2008 –

Nearby

Other plants in Erath County

Buckthorn Wind · 101 MWTPE Erath Solar, LLC · 9.9 MW

Questions

Silver Star I Wind Power Project, answered

How much power does Silver Star I Wind Power Project produce?

Silver Star I Wind Power Project has 53 MW of capacity from one generator. In 2025 it generated 205 GWh, 44% of the most it could have made running flat out all year (its capacity factor).

How many homes does Silver Star I Wind Power Project power?

Its 2025 output of 205 GWh equals the yearly electricity use of about 15,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Silver Star I Wind Power Project?

Silver Star I Wind Power Project is in Erath County, Texas, at about 32.339°, -98.476°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Erath County goes 7.2 hours a year without power, the 157th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Silver Star I Wind Power Project?

It is operated by Silver Star I Power Partners LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Silver Star I Wind Power Project open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.