Oil power plant · Brown, MN
Sleepy Eye
Sleepy Eye is a 11 MW oil power plant in Brown County, Minnesota, operated by Sleepy Eye Public Utility Comm. Its oldest generator still running came online in 1995.
Sleepy Eye in context
Among the 73 other-fuel plants in Minnesota in the EIA's inventory, it is the 29th largest, about 1.0% of the state's 1.1 GW of other-fuel capacity.
Brown County has 3 power plants of 1 MW or more with 99 MW in all; Sleepy Eye is 12% of that and the 2nd largest of 3 oil plants there.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
Sleepy Eye (outlined) and other plants in Brown County, shaded. 44.298, -94.725.
Plant facts
- Operator
- Sleepy Eye Public Utility Comm
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Brown County, MN
- EIA plant ID
- 2011
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| NEW | Petroleum Liquids | 2.0 MW | 2001 | – |
| 6 | Petroleum Liquids | 2.0 MW | 2009 | – |
| 7 | Petroleum Liquids | 2.0 MW | 2009 | – |
| IC4 | Petroleum Liquids | 1.8 MW | 1995 | – |
| 5 | Petroleum Liquids | 1.8 MW | 1996 | – |
| 1A | Petroleum Liquids | 1.8 MW | 1999 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 3 | Petroleum Liquids | 1.5 MW | 1961 | 2010 |
Nearby
Other plants in Brown County
Questions
Sleepy Eye, answered
How much power does Sleepy Eye produce?
Sleepy Eye has 11 MW of capacity from 6 generators. No full year of generation is reported yet.
Where is Sleepy Eye?
Sleepy Eye is in Brown County, Minnesota, at about 44.298°, -94.725°. It is one of 3 power plants of 1 MW or more in the county.
Who operates Sleepy Eye?
It is operated by Sleepy Eye Public Utility Comm (EIA sector: Electric Utility), and it feeds MISO.
When did Sleepy Eye open?
Its oldest generator still running came online in 1995.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Methodology.