Wind power plant · Lincoln, KS
Smoky Hills Wind Project Phase I
Smoky Hills Wind Project Phase I is a 101 MW wind power plant in Lincoln County, Kansas, operated by Smoky Hills Wind Farm I LLC. Its oldest generator still running came online in 2008. In 2025 it generated 140 GWh, about what 13,000 average Kansas homes use in a year.
Smoky Hills Wind Project Phase I in context
Among the 52 wind plants in Kansas in the EIA's inventory, it is the 43rd largest, about 1.0% of the state's 9.7 GW of wind capacity.
Lincoln County has 3 power plants of 1 MW or more with 258 MW in all; Smoky Hills Wind Project Phase I is 39% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 16% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Lincoln County goes 1.0 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Smoky Hills Wind Project Phase I (outlined) and other plants in Lincoln County, shaded. 38.880, -98.160.
Plant facts
- Operator
- Smoky Hills Wind Farm I LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Lincoln County, KS
- EIA plant ID
- 56488
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 101 MW | 2008 | – |
Nearby
Other plants in Lincoln County
Questions
Smoky Hills Wind Project Phase I, answered
How much power does Smoky Hills Wind Project Phase I produce?
Smoky Hills Wind Project Phase I has 101 MW of capacity from one generator. In 2025 it generated 140 GWh, 16% of the most it could have made running flat out all year (its capacity factor).
How many homes does Smoky Hills Wind Project Phase I power?
Its 2025 output of 140 GWh equals the yearly electricity use of about 13,000 average Kansas homes (876 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Smoky Hills Wind Project Phase I?
Smoky Hills Wind Project Phase I is in Lincoln County, Kansas, at about 38.880°, -98.160°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Lincoln County goes 1.0 hours a year without power. The county's page has the full outage record.
Who operates Smoky Hills Wind Project Phase I?
It is operated by Smoky Hills Wind Farm I LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Smoky Hills Wind Project Phase I open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Kansas home's 876 kWh a month in 2025. Methodology.