SolaireHolman Solar Project is a 50 MW solar power plant in Brewster County, Texas, operated by SolaireHolman 1, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 106 GWh, about what 8,000 average Texas homes use in a year.

Capacity50 MWNameplate, September 2026
Generated106 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2017

SolaireHolman Solar Project in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 161st largest, about 0.1% of the state's 37 GW of solar capacity.

Brewster County has 2 power plants of 1 MW or more with 123 MW in all; SolaireHolman Solar Project is 41% of that.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Brewster County goes 20 hours a year without power, the 40th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 106
0501001502019202120232025106

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

SolaireHolman Solar Project (outlined) and other plants in Brewster County, shaded. 30.455, -103.475.

Plant facts

Operator
SolaireHolman 1, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Brewster County, TX
EIA plant ID
60989
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 50 MW 2017 –

Nearby

Other plants in Brewster County

Questions

SolaireHolman Solar Project, answered

How much power does SolaireHolman Solar Project produce?

SolaireHolman Solar Project has 50 MW of capacity from one generator. In 2025 it generated 106 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does SolaireHolman Solar Project power?

Its 2025 output of 106 GWh equals the yearly electricity use of about 8,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is SolaireHolman Solar Project?

SolaireHolman Solar Project is in Brewster County, Texas, at about 30.455°, -103.475°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Brewster County goes 20 hours a year without power, the 40th most of 240 counties in Texas. The county's page has the full outage record.

Who operates SolaireHolman Solar Project?

It is operated by SolaireHolman 1, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did SolaireHolman Solar Project open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.