Wind power plant · Judith Basin, MT
South Peak Wind
South Peak Wind is a 80 MW wind power plant in Judith Basin County, Montana, operated by ALLETE Clean Energy. Its oldest generator still running came online in 2020. In 2025 it generated 243 GWh, about what 24,000 average Montana homes use in a year.
South Peak Wind in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the 11th largest, about 3.7% of the state's 2.1 GW of wind capacity.
Judith Basin County has 2 power plants of 1 MW or more with 120 MW in all; South Peak Wind is 67% of that and the largest of 2 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Judith Basin County goes 16 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
South Peak Wind (outlined) and other plants in Judith Basin County, shaded. 47.330, -110.615.
Plant facts
- Operator
- ALLETE Clean Energy
- Sector
- IPP Non-CHP
- Grid operator
- NWMT
- County
- Judith Basin County, MT
- EIA plant ID
- 62939
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 41001 | Onshore Wind Turbine | 80 MW | 2020 | – |
Nearby
Other plants in Judith Basin County
Questions
South Peak Wind, answered
How much power does South Peak Wind produce?
South Peak Wind has 80 MW of capacity from one generator. In 2025 it generated 243 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does South Peak Wind power?
Its 2025 output of 243 GWh equals the yearly electricity use of about 24,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is South Peak Wind?
South Peak Wind is in Judith Basin County, Montana, at about 47.330°, -110.615°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Judith Basin County goes 16 hours a year without power. The county's page has the full outage record.
Who operates South Peak Wind?
It is operated by ALLETE Clean Energy (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.
When did South Peak Wind open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.