Wind power plant · Judith Basin, MT

South Peak Wind

South Peak Wind is a 80 MW wind power plant in Judith Basin County, Montana, operated by ALLETE Clean Energy. Its oldest generator still running came online in 2020. In 2025 it generated 243 GWh, about what 24,000 average Montana homes use in a year.

Capacity80 MWNameplate, September 2026
Generated243 GWhIn 2025
Capacity factor35%Share of the most it could make, 2025
Generators1Oldest from 2020

South Peak Wind in context

Among the 23 wind plants in Montana in the EIA's inventory, it is the 11th largest, about 3.7% of the state's 2.1 GW of wind capacity.

Judith Basin County has 2 power plants of 1 MW or more with 120 MW in all; South Peak Wind is 67% of that and the largest of 2 wind plants there.

Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Judith Basin County goes 16 hours a year without power. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202020212022202320242025GWh 243
0100200300400202020212022202320242025243

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

South Peak Wind (outlined) and other plants in Judith Basin County, shaded. 47.330, -110.615.

Plant facts

Operator
ALLETE Clean Energy
Sector
IPP Non-CHP
Grid operator
NWMT
County
Judith Basin County, MT
EIA plant ID
62939
Where Montana's power comes from → Montana power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
41001 Onshore Wind Turbine 80 MW 2020 –

Nearby

Other plants in Judith Basin County

Questions

South Peak Wind, answered

How much power does South Peak Wind produce?

South Peak Wind has 80 MW of capacity from one generator. In 2025 it generated 243 GWh, 35% of the most it could have made running flat out all year (its capacity factor).

How many homes does South Peak Wind power?

Its 2025 output of 243 GWh equals the yearly electricity use of about 24,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is South Peak Wind?

South Peak Wind is in Judith Basin County, Montana, at about 47.330°, -110.615°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Judith Basin County goes 16 hours a year without power. The county's page has the full outage record.

Who operates South Peak Wind?

It is operated by ALLETE Clean Energy (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.

When did South Peak Wind open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.