Solar power plant · Las Animas, CO
Spanish Peaks Solar
Spanish Peaks Solar is a 140 MW solar power plant in Las Animas County, Colorado, operated by Spanish Peaks Solar LLC. Its oldest generator still running came online in 2024. In 2025 it generated 344 GWh, about what 44,000 average Colorado homes use in a year.
Spanish Peaks Solar in context
Among the 185 solar plants in Colorado in the EIA's inventory, it is the 9th largest, about 3.7% of the state's 3.8 GW of solar capacity.
Las Animas County has 3 power plants of 1 MW or more with 179 MW in all; Spanish Peaks Solar is 78% of that and the largest of 2 solar plants there.
Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Spanish Peaks Solar (outlined) and other plants in Las Animas County, shaded. 37.378, -104.475.
Plant facts
- Operator
- Spanish Peaks Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- PSCO
- County
- Las Animas County, CO
- EIA plant ID
- 62379
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 47301 | Solar Photovoltaic | 140 MW | 2024 | 2058 |
Nearby
Other plants in Las Animas County
Questions
Spanish Peaks Solar, answered
How much power does Spanish Peaks Solar produce?
Spanish Peaks Solar has 140 MW of capacity from one generator. In 2025 it generated 344 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Spanish Peaks Solar power?
Its 2025 output of 344 GWh equals the yearly electricity use of about 44,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Spanish Peaks Solar?
Spanish Peaks Solar is in Las Animas County, Colorado, at about 37.378°, -104.475°. It is one of 3 power plants of 1 MW or more in the county.
Who operates Spanish Peaks Solar?
It is operated by Spanish Peaks Solar LLC (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.
When did Spanish Peaks Solar open?
Its oldest generator still running came online in 2024. Planned retirements are scheduled for 2058.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.