Solar power plant · Bedford, TN
SR Bell Buckle
SR Bell Buckle is a 35 MW solar power plant in Bedford County, Tennessee, operated by SR Bell Buckle, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 69 GWh, about what 4,900 average Tennessee homes use in a year.
SR Bell Buckle in context
Among the 54 solar plants in Tennessee in the EIA's inventory, it is the 9th largest, about 2.8% of the state's 1.2 GW of solar capacity.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Bedford County goes 3.0 hours a year without power, the 55th most of 73 counties in Tennessee. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
SR Bell Buckle (outlined) and other plants in Bedford County, shaded. 35.570, -86.460.
Plant facts
- Operator
- SR Bell Buckle, LLC
- Sector
- IPP Non-CHP
- Grid operator
- TVA
- County
- Bedford County, TN
- EIA plant ID
- 65630
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SRBEL | Solar Photovoltaic | 35 MW | 2023 | – |
Questions
SR Bell Buckle, answered
How much power does SR Bell Buckle produce?
SR Bell Buckle has 35 MW of capacity from one generator. In 2025 it generated 69 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does SR Bell Buckle power?
Its 2025 output of 69 GWh equals the yearly electricity use of about 4,900 average Tennessee homes (1,180 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is SR Bell Buckle?
SR Bell Buckle is in Bedford County, Tennessee, at about 35.570°, -86.460°. The average electricity customer in Bedford County goes 3.0 hours a year without power, the 55th most of 73 counties in Tennessee. The county's page has the full outage record.
Who operates SR Bell Buckle?
It is operated by SR Bell Buckle, LLC (EIA sector: IPP Non-CHP), and it feeds the Tennessee Valley Authority.
When did SR Bell Buckle open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Tennessee home's 1,180 kWh a month in 2025. Methodology.