Geothermal power plant · Pershing, NV
Star Peak Geothermal Plant
Star Peak Geothermal Plant is a 22 MW geothermal power plant in Pershing County, Nevada, operated by Star Peak Geothermal LLC.. Its oldest generator still running came online in 2022. In 2025 it generated 43 GWh, about what 4,100 average Nevada homes use in a year.
Star Peak Geothermal Plant in context
Among the 30 other-fuel plants in Nevada in the EIA's inventory, it is the 21st largest, about 2.1% of the state's 1.0 GW of other-fuel capacity.
Pershing County has 2 power plants of 1 MW or more with 45 MW in all; Star Peak Geothermal Plant is 48% of that and the 2nd largest of 2 geothermal plants there.
Its capacity factor of 22% in 2025 is close to the 25% typical for geothermal plants across the US.
The average electricity customer in Pershing County goes 5.9 hours a year without power, the 5th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Star Peak Geothermal Plant (outlined) and other plants in Pershing County, shaded. 40.532, -118.272.
Plant facts
- Operator
- Star Peak Geothermal LLC.
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Pershing County, NV
- EIA plant ID
- 65773
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 5200 | Geothermal | 5.2 MW | 2022 | – |
| 5100A | Geothermal | 5.1 MW | 2022 | – |
| 5100B | Geothermal | 5.1 MW | 2022 | – |
| 3500 | Geothermal | 3.5 MW | 2022 | – |
| STEAM | Geothermal | 3.0 MW | 2022 | – |
Nearby
Other plants in Pershing County
Questions
Star Peak Geothermal Plant, answered
How much power does Star Peak Geothermal Plant produce?
Star Peak Geothermal Plant has 22 MW of capacity from 5 generators. In 2025 it generated 43 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Star Peak Geothermal Plant power?
Its 2025 output of 43 GWh equals the yearly electricity use of about 4,100 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Star Peak Geothermal Plant?
Star Peak Geothermal Plant is in Pershing County, Nevada, at about 40.532°, -118.272°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Pershing County goes 5.9 hours a year without power, the 5th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Star Peak Geothermal Plant?
It is operated by Star Peak Geothermal LLC. (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did Star Peak Geothermal Plant open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.