Geothermal power plant · Pershing, NV

Star Peak Geothermal Plant

Star Peak Geothermal Plant is a 22 MW geothermal power plant in Pershing County, Nevada, operated by Star Peak Geothermal LLC.. Its oldest generator still running came online in 2022. In 2025 it generated 43 GWh, about what 4,100 average Nevada homes use in a year.

Capacity22 MWNameplate, September 2026
Generated43 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators5Oldest from 2022

Star Peak Geothermal Plant in context

Among the 30 other-fuel plants in Nevada in the EIA's inventory, it is the 21st largest, about 2.1% of the state's 1.0 GW of other-fuel capacity.

Pershing County has 2 power plants of 1 MW or more with 45 MW in all; Star Peak Geothermal Plant is 48% of that and the 2nd largest of 2 geothermal plants there.

Its capacity factor of 22% in 2025 is close to the 25% typical for geothermal plants across the US.

The average electricity customer in Pershing County goes 5.9 hours a year without power, the 5th most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040602022202320242025GWh 43
0204060202220232024202543

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Star Peak Geothermal Plant (outlined) and other plants in Pershing County, shaded. 40.532, -118.272.

Plant facts

Operator
Star Peak Geothermal LLC.
Sector
IPP Non-CHP
Grid operator
NEVP
County
Pershing County, NV
EIA plant ID
65773
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
5200 Geothermal 5.2 MW 2022 –
5100A Geothermal 5.1 MW 2022 –
5100B Geothermal 5.1 MW 2022 –
3500 Geothermal 3.5 MW 2022 –
STEAM Geothermal 3.0 MW 2022 –

Nearby

Other plants in Pershing County

Questions

Star Peak Geothermal Plant, answered

How much power does Star Peak Geothermal Plant produce?

Star Peak Geothermal Plant has 22 MW of capacity from 5 generators. In 2025 it generated 43 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does Star Peak Geothermal Plant power?

Its 2025 output of 43 GWh equals the yearly electricity use of about 4,100 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Star Peak Geothermal Plant?

Star Peak Geothermal Plant is in Pershing County, Nevada, at about 40.532°, -118.272°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Pershing County goes 5.9 hours a year without power, the 5th most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Star Peak Geothermal Plant?

It is operated by Star Peak Geothermal LLC. (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Star Peak Geothermal Plant open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.