Solar power plant · Hunt, TX

Sterling Solar (TX)

Sterling Solar (TX) is a 10 MW solar power plant in Hunt County, Texas, operated by Headwater Energy, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 3.9 GWh, about what 293 average Texas homes use in a year.

Capacity10 MWNameplate, September 2026
Generated3.9 GWhIn 2025
Capacity factor5%Share of the most it could make, 2025
Generators1Oldest from 2018

Sterling Solar (TX) in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 190th largest, about 0.0% of the state's 37 GW of solar capacity.

Hunt County has 5 power plants of 1 MW or more with 372 MW in all; Sterling Solar (TX) is 3% of that and the 3rd largest of 3 solar plants there.

Its capacity factor of 5% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Hunt County goes 6.5 hours a year without power, the 177th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0510152020182019202020212022202320242025GWh 4
0510152020192021202320254

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Sterling Solar (TX) (outlined) and other plants in Hunt County, shaded. 33.166, -96.173.

Plant facts

Operator
Headwater Energy, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Hunt County, TX
EIA plant ID
61871
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Solar Photovoltaic 10 MW 2018 –

Questions

Sterling Solar (TX), answered

How much power does Sterling Solar (TX) produce?

Sterling Solar (TX) has 10 MW of capacity from one generator. In 2025 it generated 3.9 GWh, 5% of the most it could have made running flat out all year (its capacity factor).

How many homes does Sterling Solar (TX) power?

Its 2025 output of 3.9 GWh equals the yearly electricity use of about 293 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Sterling Solar (TX)?

Sterling Solar (TX) is in Hunt County, Texas, at about 33.166°, -96.173°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Hunt County goes 6.5 hours a year without power, the 177th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Sterling Solar (TX)?

It is operated by Headwater Energy, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Sterling Solar (TX) open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.