Solar power plant · Crawford, OH
Sycamore Creek Solar, LLC
Sycamore Creek Solar, LLC is a 117 MW solar power plant in Crawford County, Ohio, operated by Geronimo Power. Its oldest generator still running came online in 2025. In 2025 it generated 24 GWh, about what 2,300 average Ohio homes use in a year.
Sycamore Creek Solar, LLC in context
Among the 77 solar plants in Ohio in the EIA's inventory, it is the 18th largest, about 2.4% of the state's 5.0 GW of solar capacity.
Crawford County has 3 power plants of 1 MW or more with 172 MW in all; Sycamore Creek Solar, LLC is 68% of that.
The average electricity customer in Crawford County goes 2.6 hours a year without power, the 78th most of 88 counties in Ohio. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Sycamore Creek Solar, LLC (outlined) and other plants in Crawford County, shaded. 40.953, -82.859.
Plant facts
- Operator
- Geronimo Power
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Crawford County, OH
- EIA plant ID
- 69875
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SYCSL | Solar Photovoltaic | 117 MW | 2025 | – |
Nearby
Other plants in Crawford County
Questions
Sycamore Creek Solar, LLC, answered
How much power does Sycamore Creek Solar, LLC produce?
Sycamore Creek Solar, LLC has 117 MW of capacity from one generator. In 2025 it generated 24 GWh.
How many homes does Sycamore Creek Solar, LLC power?
Its 2025 output of 24 GWh equals the yearly electricity use of about 2,300 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sycamore Creek Solar, LLC?
Sycamore Creek Solar, LLC is in Crawford County, Ohio, at about 40.953°, -82.859°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Crawford County goes 2.6 hours a year without power, the 78th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Sycamore Creek Solar, LLC?
It is operated by Geronimo Power (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Sycamore Creek Solar, LLC open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.