Wind power plant · Lynn, TX
Tahoka Wind
Tahoka Wind is a 300 MW wind power plant in Lynn County, Texas, operated by Tahoka Wind, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 1.2 TWh, about what 87,000 average Texas homes use in a year.
Tahoka Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 30th largest, about 0.7% of the state's 45 GW of wind capacity.
Lynn County has 3 power plants of 1 MW or more with 700 MW in all; Tahoka Wind is 43% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Lynn County goes 19 hours a year without power, the 45th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tahoka Wind (outlined) and other plants in Lynn County, shaded. 33.151, -101.679.
Plant facts
- Operator
- Tahoka Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Lynn County, TX
- EIA plant ID
- 61921
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TAH | Onshore Wind Turbine | 300 MW | 2018 | – |
Nearby
Other plants in Lynn County
Questions
Tahoka Wind, answered
How much power does Tahoka Wind produce?
Tahoka Wind has 300 MW of capacity from one generator. In 2025 it generated 1.2 TWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tahoka Wind power?
Its 2025 output of 1.2 TWh equals the yearly electricity use of about 87,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tahoka Wind?
Tahoka Wind is in Lynn County, Texas, at about 33.151°, -101.679°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Lynn County goes 19 hours a year without power, the 45th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Tahoka Wind?
It is operated by Tahoka Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Tahoka Wind open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.