Oil power plant · Accomack, VA
Tasley
Tasley is a 27 MW oil power plant in Accomack County, Virginia, operated by Calpine Mid-Atlantic Generation LLC. Its oldest generator still running came online in 1972. In 2025 it generated 2.6 GWh, about what 203 average Virginia homes use in a year.
Tasley in context
Among the 55 other-fuel plants in Virginia in the EIA's inventory, it is the 15th largest, about 1.6% of the state's 1.7 GW of other-fuel capacity.
Accomack County has 8 power plants of 1 MW or more with 540 MW in all; Tasley is 5% of that and the 2nd largest of 6 oil plants there.
Its capacity factor of 1% in 2025 is lower than the 25% typical for oil plants across the US.
The average electricity customer in Accomack County goes 4.0 hours a year without power, the 112th most of 123 counties in Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tasley (outlined) and other plants in Accomack County, shaded. 37.706, -75.703.
Plant facts
- Operator
- Calpine Mid-Atlantic Generation LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Accomack County, VA
- EIA plant ID
- 3785
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TAS | Petroleum Liquids | 27 MW | 1972 | – |
Nearby
Other plants in Accomack County
Questions
Tasley, answered
How much power does Tasley produce?
Tasley has 27 MW of capacity from one generator. In 2025 it generated 2.6 GWh, 1% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tasley power?
Its 2025 output of 2.6 GWh equals the yearly electricity use of about 203 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tasley?
Tasley is in Accomack County, Virginia, at about 37.706°, -75.703°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Accomack County goes 4.0 hours a year without power, the 112th most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Tasley?
It is operated by Calpine Mid-Atlantic Generation LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Tasley open?
Its oldest generator still running came online in 1972.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.