Natural gas power plant · Rusk, TX
Tenaska Gateway Generating Station
Tenaska Gateway Generating Station is a 940 MW natural gas power plant in Rusk County, Texas, operated by Tenaska Gateway Partners Ltd. Its oldest generator still running came online in 2001. In 2025 it generated 4.7 TWh, about what 354,000 average Texas homes use in a year.
Tenaska Gateway Generating Station in context
Among the 309 natural gas plants in Texas in the EIA's inventory, it is the 25th largest, about 1.1% of the state's 83 GW of natural gas capacity.
Rusk County has 3 power plants of 1 MW or more with 3.5 GW in all; Tenaska Gateway Generating Station is 27% of that.
Its capacity factor of 57% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Rusk County goes 21 hours a year without power, the 38th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Tenaska Gateway Generating Station (outlined) and other plants in Rusk County, shaded. 32.018, -94.620.
Plant facts
- Operator
- Tenaska Gateway Partners Ltd
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Rusk County, TX
- EIA plant ID
- 55132
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| STG1 | Natural Gas Fired Combined Cycle | 390 MW | 2001 | – |
| GTG1 | Natural Gas Fired Combined Cycle | 183 MW | 2001 | – |
| GTG2 | Natural Gas Fired Combined Cycle | 183 MW | 2001 | – |
| GTG3 | Natural Gas Fired Combined Cycle | 183 MW | 2001 | – |
Nearby
Other plants in Rusk County
Questions
Tenaska Gateway Generating Station, answered
How much power does Tenaska Gateway Generating Station produce?
Tenaska Gateway Generating Station has 940 MW of capacity from 4 generators. In 2025 it generated 4.7 TWh, 57% of the most it could have made running flat out all year (its capacity factor).
How many homes does Tenaska Gateway Generating Station power?
Its 2025 output of 4.7 TWh equals the yearly electricity use of about 354,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Tenaska Gateway Generating Station?
Tenaska Gateway Generating Station is in Rusk County, Texas, at about 32.018°, -94.620°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Rusk County goes 21 hours a year without power, the 38th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Tenaska Gateway Generating Station?
It is operated by Tenaska Gateway Partners Ltd (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Tenaska Gateway Generating Station open?
Its oldest generator still running came online in 2001.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.