Storage power plant · Val Verde, TX

Tierra Seca

Tierra Seca is a 100 MW storage power plant in Val Verde County, Texas, operated by Tierra Seca BESS, LLC. Its oldest generator still running came online in 2026.

Capacity100 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Tierra Seca in context

Among the 233 storage plants in Texas in the EIA's inventory, it is the 83rd largest, about 0.6% of the state's 16 GW of storage capacity.

Val Verde County has 6 power plants of 1 MW or more with 396 MW in all; Tierra Seca is 25% of that and the largest of 3 storage plants there.

The average electricity customer in Val Verde County goes 11 hours a year without power, the 106th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Tierra Seca (outlined) and other plants in Val Verde County, shaded. 29.349, -100.873.

Plant facts

Operator
Tierra Seca BESS, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Val Verde County, TX
EIA plant ID
68748
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
TS Batteries 100 MW · 200 MWh 2026 –

Nearby

Other plants in Val Verde County

Questions

Tierra Seca, answered

How much can Tierra Seca store and deliver?

Tierra Seca can deliver up to 100 MW and hold 200 MWh of energy, from one battery or storage system.

Where is Tierra Seca?

Tierra Seca is in Val Verde County, Texas, at about 29.349°, -100.873°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Val Verde County goes 11 hours a year without power, the 106th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Tierra Seca?

It is operated by Tierra Seca BESS, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Tierra Seca open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.