Wind power plant · Worth, IA
Top of Iowa Windfarm III
Top of Iowa Windfarm III is a 30 MW wind power plant in Worth County, Iowa, operated by Madison Gas & Electric Co. Its oldest generator still running came online in 2008. In 2025 it generated 40 GWh, about what 3,900 average Iowa homes use in a year.
Top of Iowa Windfarm III in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 79th largest, about 0.2% of the state's 13 GW of wind capacity.
Worth County has 7 power plants of 1 MW or more with 355 MW in all; Top of Iowa Windfarm III is 8% of that and the 4th largest of 6 wind plants there.
Its capacity factor of 15% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Worth County goes 12 hours a year without power, the 10th most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Top of Iowa Windfarm III (outlined) and other plants in Worth County, shaded. 43.360, -93.321.
Plant facts
- Operator
- Madison Gas & Electric Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Worth County, IA
- EIA plant ID
- 56386
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TOI3 | Onshore Wind Turbine | 30 MW | 2008 | – |
Nearby
Other plants in Worth County
Questions
Top of Iowa Windfarm III, answered
How much power does Top of Iowa Windfarm III produce?
Top of Iowa Windfarm III has 30 MW of capacity from one generator. In 2025 it generated 40 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does Top of Iowa Windfarm III power?
Its 2025 output of 40 GWh equals the yearly electricity use of about 3,900 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Top of Iowa Windfarm III?
Top of Iowa Windfarm III is in Worth County, Iowa, at about 43.360°, -93.321°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Worth County goes 12 hours a year without power, the 10th most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Top of Iowa Windfarm III?
It is operated by Madison Gas & Electric Co (EIA sector: Electric Utility), and it feeds MISO.
When did Top of Iowa Windfarm III open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.