Solar power plant · Providence, RI

TPE King Solar Holdings1, LLC (CSG)

TPE King Solar Holdings1, LLC (CSG) is a 13 MW solar power plant in Providence County, Rhode Island, operated by Nautilus Solar Solutions. Its oldest generator still running came online in 2022. In 2025 it generated 18 GWh, about what 2,700 average Rhode Island homes use in a year.

Capacity13 MWNameplate, September 2026
Generated18 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators1Oldest from 2022

TPE King Solar Holdings1, LLC (CSG) in context

Among the 77 solar plants in Rhode Island in the EIA's inventory, it is the 7th largest, about 2.8% of the state's 452 MW of solar capacity.

Providence County has 55 power plants of 1 MW or more with 1.9 GW in all; TPE King Solar Holdings1, LLC (CSG) is 1% of that and the largest of 32 solar plants there.

Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Providence County goes 4.5 hours a year without power, the 3rd most of 5 counties in Rhode Island. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05101520252022202320242025GWh 18
0510152025202220232024202518

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

TPE King Solar Holdings1, LLC (CSG) (outlined) and other plants in Providence County, shaded. 41.979, -71.581.

Plant facts

Operator
Nautilus Solar Solutions
Sector
IPP Non-CHP
Grid operator
ISNE
County
Providence County, RI
EIA plant ID
64603
Where Rhode Island's power comes from → Rhode Island power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
KING1 Solar Photovoltaic 13 MW 2022 –

Questions

TPE King Solar Holdings1, LLC (CSG), answered

How much power does TPE King Solar Holdings1, LLC (CSG) produce?

TPE King Solar Holdings1, LLC (CSG) has 13 MW of capacity from one generator. In 2025 it generated 18 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does TPE King Solar Holdings1, LLC (CSG) power?

Its 2025 output of 18 GWh equals the yearly electricity use of about 2,700 average Rhode Island homes (562 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is TPE King Solar Holdings1, LLC (CSG)?

TPE King Solar Holdings1, LLC (CSG) is in Providence County, Rhode Island, at about 41.979°, -71.581°. It is one of 55 power plants of 1 MW or more in the county. The average electricity customer in Providence County goes 4.5 hours a year without power, the 3rd most of 5 counties in Rhode Island. The county's page has the full outage record.

Who operates TPE King Solar Holdings1, LLC (CSG)?

It is operated by Nautilus Solar Solutions (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did TPE King Solar Holdings1, LLC (CSG) open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Rhode Island home's 562 kWh a month in 2025. Methodology.