Wind power plant · Prowers, CO
Twin Buttes II Wind
Twin Buttes II Wind is a 75 MW wind power plant in Prowers County, Colorado, operated by Avangrid Power LLC. Its oldest generator still running came online in 2017. In 2025 it generated 298 GWh, about what 38,000 average Colorado homes use in a year.
Twin Buttes II Wind in context
Among the 34 wind plants in Colorado in the EIA's inventory, it is the 24th largest, about 1.3% of the state's 5.9 GW of wind capacity.
Prowers County has 4 power plants of 1 MW or more with 248 MW in all; Twin Buttes II Wind is 30% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Twin Buttes II Wind (outlined) and other plants in Prowers County, shaded. 37.773, -102.546.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- WACM
- County
- Prowers County, CO
- EIA plant ID
- 61040
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 75 MW | 2017 | – |
Nearby
Other plants in Prowers County
Questions
Twin Buttes II Wind, answered
How much power does Twin Buttes II Wind produce?
Twin Buttes II Wind has 75 MW of capacity from one generator. In 2025 it generated 298 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Twin Buttes II Wind power?
Its 2025 output of 298 GWh equals the yearly electricity use of about 38,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Twin Buttes II Wind?
Twin Buttes II Wind is in Prowers County, Colorado, at about 37.773°, -102.546°. It is one of 4 power plants of 1 MW or more in the county.
Who operates Twin Buttes II Wind?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.
When did Twin Buttes II Wind open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.