Wind power plant · Bent, CO
Twin Buttes Wind Project
Twin Buttes Wind Project is a 75 MW wind power plant in Bent County, Colorado, operated by Avangrid Power LLC. Its oldest generator still running came online in 2007. In 2025 it generated 228 GWh, about what 29,000 average Colorado homes use in a year.
Twin Buttes Wind Project in context
Among the 34 wind plants in Colorado in the EIA's inventory, it is the 23rd largest, about 1.3% of the state's 5.9 GW of wind capacity.
Bent County has 2 power plants of 1 MW or more with 81 MW in all; Twin Buttes Wind Project is 93% of that.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Twin Buttes Wind Project (outlined) and other plants in Bent County, shaded. 37.673, -102.862.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- PSCO
- County
- Bent County, CO
- EIA plant ID
- 56460
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 75 MW | 2007 | – |
Nearby
Other plants in Bent County
Questions
Twin Buttes Wind Project, answered
How much power does Twin Buttes Wind Project produce?
Twin Buttes Wind Project has 75 MW of capacity from one generator. In 2025 it generated 228 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does Twin Buttes Wind Project power?
Its 2025 output of 228 GWh equals the yearly electricity use of about 29,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Twin Buttes Wind Project?
Twin Buttes Wind Project is in Bent County, Colorado, at about 37.673°, -102.862°. It is one of 2 power plants of 1 MW or more in the county.
Who operates Twin Buttes Wind Project?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.
When did Twin Buttes Wind Project open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.