Solar power plant · Henderson, KY
Unbridled Solar
Unbridled Solar is a 160 MW solar power plant in Henderson County, Kentucky, operated by Geronimo Power. Its oldest generator still running came online in 2025. In 2025 it generated 312 GWh, about what 24,000 average Kentucky homes use in a year.
Unbridled Solar in context
Among the 20 solar plants in Kentucky in the EIA's inventory, it is the 4th largest, about 12% of the state's 1.4 GW of solar capacity.
Henderson County has 3 power plants of 1 MW or more with 560 MW in all; Unbridled Solar is 29% of that and the 2nd largest of 3 solar plants there.
The average electricity customer in Henderson County goes 4.8 hours a year without power, the 94th most of 119 counties in Kentucky. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Unbridled Solar (outlined) and other plants in Henderson County, shaded. 37.652, -87.552.
Plant facts
- Operator
- Geronimo Power
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Henderson County, KY
- EIA plant ID
- 67165
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| UBSLR | Solar Photovoltaic | 160 MW | 2025 | – |
Nearby
Other plants in Henderson County
Questions
Unbridled Solar, answered
How much power does Unbridled Solar produce?
Unbridled Solar has 160 MW of capacity from one generator. In 2025 it generated 312 GWh.
How many homes does Unbridled Solar power?
Its 2025 output of 312 GWh equals the yearly electricity use of about 24,000 average Kentucky homes (1,094 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Unbridled Solar?
Unbridled Solar is in Henderson County, Kentucky, at about 37.652°, -87.552°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Henderson County goes 4.8 hours a year without power, the 94th most of 119 counties in Kentucky. The county's page has the full outage record.
Who operates Unbridled Solar?
It is operated by Geronimo Power (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Unbridled Solar open?
Its oldest generator still running came online in 2025.