Wind power plant · Marshall, IA

Vienna Wind Farm

Vienna Wind Farm is a 150 MW wind power plant in Marshall County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2012. In 2025 it generated 622 GWh, about what 60,000 average Iowa homes use in a year.

Capacity150 MWNameplate, September 2026
Generated622 GWhIn 2025
Capacity factor47%Share of the most it could make, 2025
Generators2Oldest from 2012

Vienna Wind Farm in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 41st largest, about 1.1% of the state's 13 GW of wind capacity.

Marshall County has 6 power plants of 1 MW or more with 1.2 GW in all; Vienna Wind Farm is 13% of that and the largest of 2 wind plants there.

Its capacity factor of 47% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Marshall County goes 24 hours a year without power, the 1st most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 622
02004006008002019202120232025622

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Vienna Wind Farm (outlined) and other plants in Marshall County, shaded. 42.159, -92.776.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Marshall County, IA
EIA plant ID
57874
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
VIWF Onshore Wind Turbine 106 MW 2012 –
VIIWF Onshore Wind Turbine 45 MW 2013 –

Questions

Vienna Wind Farm, answered

How much power does Vienna Wind Farm produce?

Vienna Wind Farm has 150 MW of capacity from 2 generators. In 2025 it generated 622 GWh, 47% of the most it could have made running flat out all year (its capacity factor).

How many homes does Vienna Wind Farm power?

Its 2025 output of 622 GWh equals the yearly electricity use of about 60,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Vienna Wind Farm?

Vienna Wind Farm is in Marshall County, Iowa, at about 42.159°, -92.776°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Marshall County goes 24 hours a year without power, the 1st most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Vienna Wind Farm?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Vienna Wind Farm open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.