Solar power plant · Cumberland, NJ
Vineland Solar LLC
Vineland Solar LLC is a 15 MW solar power plant in Cumberland County, New Jersey, operated by NJR Clean Energy Ventures Corporation. Its oldest generator still running came online in 2026.
Vineland Solar LLC in context
Among the 352 solar plants in New Jersey in the EIA's inventory, it is the 10th largest, about 1.1% of the state's 1.3 GW of solar capacity.
Cumberland County has 21 power plants of 1 MW or more with 555 MW in all; Vineland Solar LLC is 3% of that and the largest of 16 solar plants there.
The average electricity customer in Cumberland County goes 2.8 hours a year without power, the 17th most of 21 counties in New Jersey. The county's page has the full outage record.
Where it is
Vineland Solar LLC (outlined) and other plants in Cumberland County, shaded. 39.471, -75.061.
Plant facts
- Operator
- NJR Clean Energy Ventures Corporation
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Cumberland County, NJ
- EIA plant ID
- 69951
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| VNLD2 | Solar Photovoltaic | 15 MW | 2026 | – |
Nearby
Other plants in Cumberland County
Questions
Vineland Solar LLC, answered
How much power does Vineland Solar LLC produce?
Vineland Solar LLC has 15 MW of capacity from one generator. No full year of generation is reported yet.
Where is Vineland Solar LLC?
Vineland Solar LLC is in Cumberland County, New Jersey, at about 39.471°, -75.061°. It is one of 21 power plants of 1 MW or more in the county. The average electricity customer in Cumberland County goes 2.8 hours a year without power, the 17th most of 21 counties in New Jersey. The county's page has the full outage record.
Who operates Vineland Solar LLC?
It is operated by NJR Clean Energy Ventures Corporation (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Vineland Solar LLC open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.