Solar power plant · Clarke, AL

Walker Springs II

Walker Springs II is a 80 MW solar power plant in Clarke County, Alabama, operated by Origis Energy USA, Inc. Its oldest generator still running came online in 2026.

Capacity80 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Walker Springs II in context

Among the 15 solar plants in Alabama in the EIA's inventory, it is the 6th largest, about 8.1% of the state's 987 MW of solar capacity.

Clarke County has 3 power plants of 1 MW or more with 204 MW in all; Walker Springs II is 39% of that and the largest of 2 solar plants there.

The average electricity customer in Clarke County goes 5.9 hours a year without power, the 38th most of 60 counties in Alabama. The county's page has the full outage record.

Where it is

Walker Springs II (outlined) and other plants in Clarke County, shaded. 31.435, -87.705.

Plant facts

Operator
Origis Energy USA, Inc
Sector
IPP Non-CHP
Grid operator
SOCO
County
Clarke County, AL
EIA plant ID
68669
Where Alabama's power comes from → Alabama power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
OEALH Solar Photovoltaic 80 MW 2026 –

Questions

Walker Springs II, answered

How much power does Walker Springs II produce?

Walker Springs II has 80 MW of capacity from one generator. No full year of generation is reported yet.

Where is Walker Springs II?

Walker Springs II is in Clarke County, Alabama, at about 31.435°, -87.705°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Clarke County goes 5.9 hours a year without power, the 38th most of 60 counties in Alabama. The county's page has the full outage record.

Who operates Walker Springs II?

It is operated by Origis Energy USA, Inc (EIA sector: IPP Non-CHP), and it feeds Southern Company.

When did Walker Springs II open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.