Warroad Factory is a 11 MW oil power plant in Roseau County, Minnesota, operated by Marvin. Its oldest generator still running came online in 1983.

Capacity11 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators15Oldest from 1983

Warroad Factory in context

Among the 73 other-fuel plants in Minnesota in the EIA's inventory, it is the 33rd largest, about 1.0% of the state's 1.1 GW of other-fuel capacity.

Where it is

Warroad Factory (outlined) and other plants in Roseau County, shaded. 48.916, -95.326.

Plant facts

Operator
Marvin
Sector
Industrial Non-CHP
Grid operator
MISO
County
Roseau County, MN
EIA plant ID
69725
  • Other7.3 MW67%
  • Storage2.0 MW18%
  • Natural gas1.6 MW15%
Where Minnesota's power comes from → Minnesota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
4EBES Batteries 1.0 MW · 1 MWh 2025 –
4WBES Batteries 1.0 MW · 1 MWh 2025 –
1&2E Petroleum Liquids 0.8 MW 1986 –
1&2W Petroleum Liquids 0.8 MW 1986 –
3A&3B Petroleum Liquids 0.8 MW 1987 –
6 Petroleum Liquids 0.8 MW 1987 –
7N Petroleum Liquids 0.8 MW 1994 –
7S Petroleum Liquids 0.8 MW 1994 –
4E Natural Gas Internal Combustion Engine 0.8 MW 2025 –
4W Natural Gas Internal Combustion Engine 0.8 MW 2025 –
4N Petroleum Liquids 0.5 MW 1983 2030
4S Petroleum Liquids 0.5 MW 1983 2030
1 Petroleum Liquids 0.5 MW 1986 –
5 Petroleum Liquids 0.5 MW 1987 2030
7W Petroleum Liquids 0.5 MW 1997 –

Questions

Warroad Factory, answered

How much power does Warroad Factory produce?

Warroad Factory has 11 MW of capacity from 15 generators. No full year of generation is reported yet.

Where is Warroad Factory?

Warroad Factory is in Roseau County, Minnesota, at about 48.916°, -95.326°.

Who operates Warroad Factory?

It is operated by Marvin (EIA sector: Industrial Non-CHP), and it feeds MISO.

When did Warroad Factory open?

Its oldest generator still running came online in 1983. Planned retirements are scheduled for 2030.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.