Hydro power plant · Carter, TN
Watauga
Watauga is a 58 MW hydro power plant in Carter County, Tennessee, operated by Tennessee Valley Authority. Its oldest generator still running came online in 1949. In 2025 it generated 94 GWh, about what 6,600 average Tennessee homes use in a year.
Watauga in context
Among the 28 hydro plants in Tennessee in the EIA's inventory, it is the 17th largest, about 2.3% of the state's 2.5 GW of hydro capacity.
Carter County has 2 power plants of 1 MW or more with 68 MW in all; Watauga is 84% of that and the largest of 2 hydro plants there.
Its capacity factor of 19% in 2025 is lower than the 34% typical for hydro plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Watauga (outlined) and other plants in Carter County, shaded. 36.341, -82.126.
Plant facts
- Operator
- Tennessee Valley Authority
- Sector
- Electric Utility
- Grid operator
- TVA
- County
- Carter County, TN
- EIA plant ID
- 3418
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 29 MW | 1949 | – |
| 2 | Conventional Hydroelectric | 29 MW | 1949 | – |
Nearby
Other plants in Carter County
Questions
Watauga, answered
How much power does Watauga produce?
Watauga has 58 MW of capacity from 2 generators. In 2025 it generated 94 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Watauga power?
Its 2025 output of 94 GWh equals the yearly electricity use of about 6,600 average Tennessee homes (1,180 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Watauga?
Watauga is in Carter County, Tennessee, at about 36.341°, -82.126°. It is one of 2 power plants of 1 MW or more in the county.
Who operates Watauga?
It is operated by Tennessee Valley Authority (EIA sector: Electric Utility), and it feeds the Tennessee Valley Authority.
When did Watauga open?
Its oldest generator still running came online in 1949.