Coal power plant · Titus, TX
Welsh
Welsh is a 1.1 GW coal power plant in Titus County, Texas, operated by Southwestern Electric Power Co. Its oldest generator still running came online in 1977. In 2025 it generated 4.1 TWh, about what 309,000 average Texas homes use in a year.
Welsh in context
Among the 12 coal plants in Texas in the EIA's inventory, it is the 8th largest, about 6.3% of the state's 18 GW of coal capacity.
Its capacity factor of 42% in 2025 is close to the 45% typical for coal plants across the US.
The average electricity customer in Titus County goes 14 hours a year without power, the 82nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Welsh (outlined) and other plants in Titus County, shaded. 33.055, -94.840.
Plant facts
- Operator
- Southwestern Electric Power Co
- Sector
- Electric Utility
- Grid operator
- SWPP
- County
- Titus County, TX
- EIA plant ID
- 6139
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | 558 MW | 1977 | – |
| 3 | Conventional Steam Coal | 558 MW | 1982 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 2 | Conventional Steam Coal | 558 MW | 1980 | 2016 |
Questions
Welsh, answered
How much power does Welsh produce?
Welsh has 1.1 GW of capacity from 2 generators. In 2025 it generated 4.1 TWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Welsh power?
Its 2025 output of 4.1 TWh equals the yearly electricity use of about 309,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Welsh?
Welsh is in Titus County, Texas, at about 33.055°, -94.840°. The average electricity customer in Titus County goes 14 hours a year without power, the 82nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Welsh?
It is operated by Southwestern Electric Power Co (EIA sector: Electric Utility), and it feeds the Southwest Power Pool.
When did Welsh open?
Its oldest generator still running came online in 1977.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.