Wind power plant · Jerauld, SD
Wessington Springs
Wessington Springs is a 51 MW wind power plant in Jerauld County, South Dakota, operated by Wessington Wind. Its oldest generator still running came online in 2009. In 2025 it generated 231 GWh, about what 20,000 average South Dakota homes use in a year.
Wessington Springs in context
Among the 25 wind plants in South Dakota in the EIA's inventory, it is the 19th largest, about 1.5% of the state's 3.5 GW of wind capacity.
Jerauld County has 2 power plants of 1 MW or more with 213 MW in all; Wessington Springs is 24% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 52% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Jerauld County goes 1.2 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wessington Springs (outlined) and other plants in Jerauld County, shaded. 44.002, -98.591.
Plant facts
- Operator
- Wessington Wind
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Jerauld County, SD
- EIA plant ID
- 56650
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 51 MW | 2009 | – |
Nearby
Other plants in Jerauld County
Questions
Wessington Springs, answered
How much power does Wessington Springs produce?
Wessington Springs has 51 MW of capacity from one generator. In 2025 it generated 231 GWh, 52% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wessington Springs power?
Its 2025 output of 231 GWh equals the yearly electricity use of about 20,000 average South Dakota homes (984 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wessington Springs?
Wessington Springs is in Jerauld County, South Dakota, at about 44.002°, -98.591°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Jerauld County goes 1.2 hours a year without power. The county's page has the full outage record.
Who operates Wessington Springs?
It is operated by Wessington Wind (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Wessington Springs open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average South Dakota home's 984 kWh a month in 2025. Methodology.