Solar power plant · Reeves, TX

West of the Pecos Solar

West of the Pecos Solar is a 100 MW solar power plant in Reeves County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 245 GWh, about what 18,000 average Texas homes use in a year.

Capacity100 MWNameplate, September 2026
Generated245 GWhIn 2025
Capacity factor28%Share of the most it could make, 2025
Generators1Oldest from 2019

West of the Pecos Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 143rd largest, about 0.3% of the state's 37 GW of solar capacity.

Reeves County has 15 power plants of 1 MW or more with 621 MW in all; West of the Pecos Solar is 16% of that.

Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Reeves County goes 6.9 hours a year without power, the 167th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01002003002019202020212022202320242025GWh 245
01002003002019202120232025245

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

West of the Pecos Solar (outlined) and other plants in Reeves County, shaded. 31.431, -103.729.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Reeves County, TX
EIA plant ID
62415
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WOTP1 Solar Photovoltaic 100 MW 2019 –

Nearby

Other plants in Reeves County

Questions

West of the Pecos Solar, answered

How much power does West of the Pecos Solar produce?

West of the Pecos Solar has 100 MW of capacity from one generator. In 2025 it generated 245 GWh, 28% of the most it could have made running flat out all year (its capacity factor).

How many homes does West of the Pecos Solar power?

Its 2025 output of 245 GWh equals the yearly electricity use of about 18,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is West of the Pecos Solar?

West of the Pecos Solar is in Reeves County, Texas, at about 31.431°, -103.729°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Reeves County goes 6.9 hours a year without power, the 167th most of 240 counties in Texas. The county's page has the full outage record.

Who operates West of the Pecos Solar?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did West of the Pecos Solar open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.