Solar power plant · Olmsted, MN

Westside Solar

Westside Solar is a 10 MW solar power plant in Olmsted County, Minnesota, operated by Westside Solar, LLC (Ecofin). Its oldest generator still running came online in 2022. In 2025 it generated 19 GWh, about what 2,100 average Minnesota homes use in a year.

Capacity10 MWNameplate, September 2026
Generated19 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators2Oldest from 2022

Westside Solar in context

Among the 544 solar plants in Minnesota in the EIA's inventory, it is the 15th largest, about 0.5% of the state's 2.1 GW of solar capacity.

Olmsted County has 18 power plants of 1 MW or more with 234 MW in all; Westside Solar is 4% of that and the largest of 10 solar plants there.

Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Olmsted County goes 1.2 hours a year without power, the 49th most of 54 counties in Minnesota. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05101520252022202320242025GWh 19
0510152025202220232024202519

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Westside Solar (outlined) and other plants in Olmsted County, shaded. 44.054, -92.548.

Plant facts

Operator
Westside Solar, LLC (Ecofin)
Sector
IPP Non-CHP
Grid operator
MISO
County
Olmsted County, MN
EIA plant ID
66422
Where Minnesota's power comes from → Minnesota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SOUTH Solar Photovoltaic 6.5 MW 2022 –
NORTH Solar Photovoltaic 3.5 MW 2022 –

Nearby

Other plants in Olmsted County

Questions

Westside Solar, answered

How much power does Westside Solar produce?

Westside Solar has 10 MW of capacity from 2 generators. In 2025 it generated 19 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does Westside Solar power?

Its 2025 output of 19 GWh equals the yearly electricity use of about 2,100 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Westside Solar?

Westside Solar is in Olmsted County, Minnesota, at about 44.054°, -92.548°. It is one of 18 power plants of 1 MW or more in the county. The average electricity customer in Olmsted County goes 1.2 hours a year without power, the 49th most of 54 counties in Minnesota. The county's page has the full outage record.

Who operates Westside Solar?

It is operated by Westside Solar, LLC (Ecofin) (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Westside Solar open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.